Starting prices by layout
| Layout | From | To | Price per sqft (entry) |
|---|---|---|---|
| Type C · Studio office · 323 sqft | RM748,100 | RM780,100 | ≈ RM2,316 |
| Type A · 2-bed serviced suite · 484 sqft | RM1,106,700 | RM1,131,700 | ≈ RM2,287 |
| Type B · Dual key · 657 sqft | RM1,439,800 | RM1,457,800 | ≈ RM2,191 |
These are the ranges on the developer's fact sheet, and the RM748,100 entry is unchanged in EXSIM's November 2025 sales summary. Within each layout the gap between the cheapest and dearest unit is only RM18,000 to RM32,000, so floor and facing move the price less here than at most launches. The dual key works out cheapest per square foot.
Monthly instalment
| Price | 90% loan · 35 yrs · 3.7% | 80% loan · 30 yrs · 3.7% | 90% loan · 35 yrs · 4.2% |
|---|---|---|---|
| RM748,100 | RM2,861/mo | RM2,755/mo | RM3,062/mo |
| RM1,106,700 | RM4,233/mo | RM4,075/mo | RM4,530/mo |
| RM1,439,800 | RM5,507/mo | RM5,302/mo | RM5,894/mo |
Estimates only. The Type C studio is an office suite, so your bank may offer a lower margin or a shorter tenure than for Types A and B. Payments follow progress billing, and the building is at an early stage, so most of the loan is drawn over 2027 and 2028.
Cash needed upfront
| Item | Entry price (RM748,100) | Top of range (RM1,457,800) |
|---|---|---|
| Down payment (10%, with a 90% loan) | RM74,810 | RM145,780 |
| Stamp duty on transfer (MOT) | ≈ RM16,443 | ≈ RM42,312 |
| Stamp duty on loan (0.5%, 90% loan) | ≈ RM3,366 | ≈ RM6,560 |
Standard stamp duty scale, before any exemption. Above RM1 million, each extra ringgit is stamped at 4%, which is why the Type B transfer duty is more than double the studio's.
Maintenance fee
| Layout | Rate | Per month |
|---|---|---|
| Type C (323 sqft) | RM1.32 psf (incl. sinking fund) | ≈ RM426 |
| Type A (484 sqft) | RM1.32 psf (incl. sinking fund) | ≈ RM639 |
| Type B (657 sqft) | RM1.32 psf (incl. sinking fund) | ≈ RM867 |
EXSIM's sales summary quotes RM1.32 psf including sinking fund. The developer says it will cover a shortfall in the maintenance account of up to RM0.40 psf for the first two years, after first using car park and other building income.
Kyliez vs other EXSIM city-centre launches
| Project | Street | From | Entry psf | Completion |
|---|---|---|---|---|
| Kyliez Suites | Jalan Mayang | RM748,100 | ≈ RM2,316 | Q3 2028 |
| Hanaz Suites | Jalan Mayang | RM756,200 | ≈ RM2,341 | Est. Q1 2029 |
| Hugoz Suites | Jalan Tun Razak | RM597,500 | ≈ RM1,850 | Q4 2027 |
| Branniganz Suites | Jalan Imbi, Bukit Bintang | RM803,500 | ≈ RM2,336 | Q4 2028 |
Kyliez and Hanaz price their identical 323 sqft studios within RM8,100 of each other. Hugoz, about 450 m north on Jalan Tun Razak, is the cheaper option but sits further from the KLCC LRT. See the Hanaz Suites price list.
Buying from outside Malaysia? Which EXSIM units foreigners can buy.
Sent on WhatsApp
Get the full price list
Prices change by floor and units sell every week, so we send the current list instead of posting one that goes stale.
- Prices by floorEvery floor and facing, from the current price list
- Payment schedule & what's includedProgress billing stages and what the price covers
- Units still availableWhat's open on the floor and facing you want
Replies from a real estate negotiator (REN) with IQI Realty Sdn Bhd
Kyliez Suites price FAQ
What is the cheapest unit at Kyliez Suites?
The 323 sqft Type C studio office, from RM748,100.
What is the price per sqft at Kyliez Suites?
About RM2,191 to RM2,316 at the entry price of each layout. The dual key is the lowest per square foot.
How much cash do I need for a Kyliez Suites studio?
For RM748,100 with a 90% loan: a RM74,810 down payment, about RM16,443 stamp duty on the transfer and about RM3,366 on the loan, before legal fees.
What is the maintenance fee at Kyliez Suites?
RM1.32 psf including sinking fund, or about RM426 a month for the studio and RM867 for the dual key.
Work out your own monthly instalment
≈ RM2,861/month
Change price, loan, rate or years
Keep reading
Sources & updates
Indicative prices and sizes from the developer's sales materials, checked on the date shown. The developer's final price list and SPA prevail.
Spotted something out of date? Tell us